Paul Roberts & Partners, Inc.

SCU Leavey Center


In Phase 1, the Architect of Record was EHDD. Paul Roberts was responsible for designing, specifying and observing construction for the seating, scoreboard and sports floor specialties.
In Phase 2, the Architect or Record was Ellerbe Becket. Paul Roberts was Project Director for Ellerbe Becket.

The Scope in Phase 2 included inserting a four story building into the East end of the Arena shell that had been completed in Phase 1. The scope also included creating three new sides to the seating bowl. A major component of the space was a four story office building for the SCU Athletic Department Offices.

Key features in Phase 2 include a Conference Room that doubles as a suite for Events, an Academic Center and a Weight Training Facility for the student athletes. Phase 2 also included the East end Upper Bowl Seating, concessions and Arena support facilities.

The project was constructed on a fast track basis while the arena was continuously open. With the strong coordination bewteen the University, Devcon, The Contractor and the design team led by Paul Roberts the project came in more than $1,000,000 under budget.